Corporate
History
The production journey from İkitelli to today’s infrastructure in Kartepe.
2017 · The beginning
Our journey began in Istanbul İkitelli in a 50 m² workshop with two floor furnaces and a small team.
Relocation to Kartepe and facility investment
As capacity expanded, operations moved to the current site in Kartepe, Kocaeli. A 3-tonne TRF3 rotary furnace, then a TRF5 rotary furnace and finally a 25-tonne continuous casting furnace were added alongside the floor furnaces.
Product diversity
The casting line developed a product range covering 8–10 kg billets and 280 kg, 720 kg and 900 kg ingots.
Infrastructure today
Today we operate with five melting furnaces, auxiliary equipment, a planned production line, a dispatch network and an experienced team, with monthly production capacity of 1,200 tonnes.